What are the ballot allocations for 2016 Measure B?

The ballot allocation is the amount (in 2017 dollars) that can be spent on each program category as written in the 2016 Measure B ballot language. The percentage shown reflects the total share of Program Tax Revenues for a Program Category for the life of the measure. The ballot allocations were as follows:

  1. Local Streets & Roads (19.05%)
  2. BART Silicon Valley Phase II (25%)
  3. Bicycle and Pedestrian (3.97%)
  4. Caltrain Grade Separation (11.11%)
  5. Caltrain Capacity Improvements (4.98%)
  6. Highway Interchanges (11.90%)
  7. County Expressways (11.90%)
  8. State Route 85 Corridor (5.56%)
  9. Transit Operations (7.94%)