Orange Line: Bus Bridge for Light Rail Rehab (9/18/24-9/22/24)

Details
Alert Cause
Maintenance
Alert Effect
Modified service
Start Date
End Date
Affected Routes and Stops

VTA will be installing new elements of the track system between the Old Ironsides and Baypointe Stations. The shutdown will focus on the crossover installation near the Champion Station. Scheduled shutdowns include track and wood tie removal/replacement and placement of new ballast (stones).

Light rail schedules on the Orange Line have been modified due to scheduled maintenance. Please allow extra time for travel.

Visit the Light Rail Rehab webpage (https://www.vta.org/light-rail-rehab) for the bus bridge schedules that will be in effect.