President Biden made a strong statement of support for VTA’s BART Silicon Valley Phase II project, including a $500 million request in the administration’s budget for FY 2024. This is the initial...
Do you have ideas on how to make it easier and more enjoyable to get to the Capitol and Branham Light Rail Stations and around the neighborhood? Whether you walk, bike, take transit, or drive (or do...
Project Overview VTA’s BART Silicon Valley Phase II Extension Project (The Phase II Project) is a six-mile, four-station extension of the regional BART system from the Berryessa/North San José Station...
If you have driven, walked, or biked along Blossom Hill Road and over the interchange at US 101, you’ve likely noticed some significant improvements. Those include improved off and on ramps to US 101...
Please join this IN-PERSON meeting to learn about upcoming construction opportunities in VTA’s BART Silicon Valley Phase II Extension Program. Meet the project team and representatives from our...
An independent study by world renowned tunneling experts, confirms the Valley Transportation Authority’s single bore tunnel design is the right approach to deliver the BART Silicon Valley 6-mile...
Over a four-night period in late August, several 75ft. concrete beams were lifted in place over the US-101/De La Cruz Boulevard interchange. This recent late-night full freeway closure work is part of...
Entering and exiting Highway 101 will be a lot less stressful as work approaches completion on two busy, and previously crowded, ramps. The southbound (SB) US 101 diagonal on-ramp at Story Road and...
Those eagerly anticipating VTA’s BART Silicon Valley’s extension into San Jose and Santa Clara will soon get a glimpse of how the design of the stations and tunnel are shaping up. A joint committee of...